The fast boiler

How about the price of a 4-ton natural gas boiler?

Time : 2021-07-19

Natural gas boilers have shined in the boiler market in recent years, and the frequency of use is increasing year by year, which is mainly inseparable from the excellent performance of the boiler itself. The operating efficiency of the natural gas boilers launched by Zhengzhou Fangkuai Boiler Factory is generally above 98%, and the pollutant emission is as low as 30 mg/m3, which is deeply loved by the majority of users.

The market price of natural gas boilers has always been concerned by users and friends. Zhengzhou Fangkuai Boiler Factory took a 4-ton natural gas boiler as an example to explain it to everyone. The current market price of this type of boiler ranges from 280,000 to 350,000 yuan, depending on the type and configuration of the boiler.

After the parts and components of the gas-fired hot water boiler or gas-fired steam boiler are assembled and installed as finished products, they will inevitably undergo collision and damage after long-distance handling, loading and unloading, and installation. Therefore, it is necessary to conduct a hydraulic test after installation. Practice has proved that the boiler defects can be found through the hydraulic test and the corresponding measures can be taken in time to ensure the safety of the boiler operation.

The water pressure test of the boiler is generally divided into the water pressure test and the super water pressure test at the rated working pressure. The overpressure test pressure of the boiler body is 1.25 times the rated working pressure of the shell or the rated pressure plus 0.4 MPa.

1. When one of the following situations is encountered, an overpressure water pressure test is required:
       1. The newly installed boiler before starting trial operation;
       2. After major renovation or replacement of the pressure parts of the boiler;
       3. The boiler in operation shall be carried out once every six years (combined with the overhaul).

2. When one of the following situations is encountered, a working pressure hydraulic test is required:
       1. For boilers after major or minor repairs or emergency repairs, a hydraulic test of working pressure should be done after the repairs;
       2. If the furnace is shut down for more than 30 days, a hydraulic test of working pressure must be done before ignition;
       When conducting a hydraulic test, personnel with relevant qualifications are required to follow the standard procedures, specific operation methods and precautions.

Hot products
Full premixed condensing steam boiler

Full premixed condensing steam boiler

See more

Capacity: 1-20 t/h

Rated thermal efficiency: 100-104%

Rated working pressure: ≤1.6Mpa

Applicable fuel: Natural gas etc.

WNS integrated condensing steam boiler

WNS integrated condensing steam boiler

See more

Capacity: 1-20 t/h

Rated thermal efficiency: 100-104%

Rated working pressure: ≤3.82Mpa

Applicable fuel: Natural gas, heavy oil, etc

WNS split type condensing steam boiler

WNS split type condensing steam boiler

See more

Capacity: 1-20 t/h

Rated thermal efficiency: 97-100%

Rated working pressure: ≤3.82Mpa

Applicable fuel: Natural gas, diesel oil, etc