The fast boiler

What is the operation cost of 4 tons heating hot water boiler?

Time : 2021-06-08

Zhengzhou Fangkui Boiler Factory launched 4 tons of heating hot water boiler can meet the heating area of 36000-40000 square meters, specific to meet the heating area, but also combined with the building height, insulation measures and other actual conditions.At present, the operation cost of 4 tons heating hot water boiler is between 600 and 700 yuan per hour.

 

Of course, the appropriate adjustment of the burning mode of hot water boiler will play an important role in energy saving and emission reduction.

1, the main task of combustion adjustment

In order to meet the requirements of the external load of steam and qualified steam quality at the same time to ensure the safety and economy of the operation of the boiler.

2. Boiler combustion adjustment test

In a planned way to change some of the adjustable parameter and control mode (that is, the fuel supply mode and air distribution mode), a comprehensive adjustment of combustion condition and measure some of monomial index, then the scientific analysis of the obtained results are compared from the aspects of economy, safety, determine the best way to run the equipment running characteristics of the junior high,Such tests, measurements and analytical studies work for boiler combustion adjustment tests.

3. Significance and purpose of boiler combustion adjustment test

The purpose of the boiler combustion adjustment test is to explore the operation characteristics and laws of the boiler, and to determine the safe and economic operation mode of the boiler under the condition of the existing equipment and fuel properties.Through comprehensively, the combustion adjustment test of boiler can be obtained under the optimum operation mode of the technical and economic characteristics, including fuel, air and flue gas of the operation parameters and the boiler efficiency, and soda, auxiliary power index, etc.), to strengthen the management of power plant technology, master the equipment performance, operation regulations formulated, the combustion automatic control system, and provides the basis for economic operation of the factory.

The purpose of combustion adjustment test is to master the technical and economic characteristics of boiler operation, determine the best operation mode of boiler combustion system and the changing law of various influencing factors, so as to ensure the safety and economic operation of boiler unit.

 

Click https://www.zzfangkuai.com/boilernews/, and help you learn more knowledge of boiler.

Hot products
Full premixed condensing steam boiler

Full premixed condensing steam boiler

See more

Capacity: 1-20 t/h

Rated thermal efficiency: 100-104%

Rated working pressure: ≤1.6Mpa

Applicable fuel: Natural gas etc.

WNS integrated condensing steam boiler

WNS integrated condensing steam boiler

See more

Capacity: 1-20 t/h

Rated thermal efficiency: 100-104%

Rated working pressure: ≤3.82Mpa

Applicable fuel: Natural gas, heavy oil, etc

WNS split type condensing steam boiler

WNS split type condensing steam boiler

See more

Capacity: 1-20 t/h

Rated thermal efficiency: 97-100%

Rated working pressure: ≤3.82Mpa

Applicable fuel: Natural gas, diesel oil, etc